[Iraqi railways operating cost computations, as applied to the Al-Quaim-Akashat line : Consultative Mission to the General Establishment for Transport and Operations, General Organization for Iraqi Railways, 15-29 January 1985] / prepared by Ahmed Muhammed Farahat.
1985
Formatos
Formato | |
---|---|
BibTeX | |
MARCXML | |
TextMARC | |
MARC | |
DublinCore | |
EndNote | |
NLM | |
RefWorks | |
RIS |
Files
Detalles de los registros
SignaturaE/ECWA/TCT/85/5
Título[Iraqi railways operating cost computations, as applied to the Al-Quaim-Akashat line : Consultative Mission to the General Establishment for Transport and Operations, General Organization for Iraqi Railways, 15-29 January 1985] / prepared by Ahmed Muhammed Farahat.
Accesoالعربية: E_ECWA_TCT_85_5-AR - PDF ;
AutoresFarahat, Ahmed Muhammed.
Fecha[Baghdad] : UN, 26 Mar. 1985.
Descripción
55 p. : maps, tables.
Notas
Title and text in Arabic only; translated title; summary in English.
Prepared at the request of ECWA.
Prepared at the request of ECWA.