[Iraqi railways operating cost computations, as applied to the Al-Quaim-Akashat line : Consultative Mission to the General Establishment for Transport and Operations, General Organization for Iraqi Railways, 15-29 January 1985] / prepared by Ahmed Muhammed Farahat.
1985
Files
تفصيلات التسجيلة (السجل)
رمز / رقم الاستدعاءE/ECWA/TCT/85/5
العنوان[Iraqi railways operating cost computations, as applied to the Al-Quaim-Akashat line : Consultative Mission to the General Establishment for Transport and Operations, General Organization for Iraqi Railways, 15-29 January 1985] / prepared by Ahmed Muhammed Farahat.
عناوين أخرى
نفقات التشغيل على الخطوط الحديدية العراقية مع التطبيق على خط القائم -عكاشات
إمكانية الوصولالعربية: E_ECWA_TCT_85_5-AR - PDF ;
المؤلفونFarahat, Ahmed Muhammed.
تاريخ[Baghdad] : UN, 26 Mar. 1985.
الوصف
55 p. : maps, tables.
ملاحظات
Title and text in Arabic only; translated title; summary in English.
Prepared at the request of ECWA.
Prepared at the request of ECWA.