Revised estimates for programme and programme support costs 1976-1977 : architectural and engineering study of the construction of a permanent headquarters for UNEP in Nairboi, Kenya
1976
Formats
Format | |
---|---|
BibTeX | |
MARCXML | |
TextMARC | |
MARC | |
DublinCore | |
EndNote | |
NLM | |
RefWorks | |
RIS |
Details
SymbolUNEP/GC/72
TitleRevised estimates for programme and programme support costs 1976-1977 : architectural and engineering study of the construction of a permanent headquarters for UNEP in Nairboi, Kenya
Distribution
GEN
Summary
Includes document entitled "Proposed programme budget for the biennnium 1976-1977 : revised estimates for section 13, United Nations Environment Programme : architectural and engineering study of the construction of a permanent headquarters for UNEP in Nairobi, Kenya" ( A/C.5/1718).
Contains
Proposed programme budget for the biennium 1976-1977 : revised estimates for section 13, United Nations Environment Programme : architectural and engineering study of the construction of a permanent headquarters for UNEP in Nairobi, Kenya
DateNairobi : UNEP, 20 Jan. 1976
Description
[1], 6 p. : table
Notes
Retrospective indexing (12/03).
Job no. on publication: K76191.
Job no. on publication: K76191.