Overview of studies and field tests concerned with East-West interconnections (1993 and beginning of 1994).
1995
Formats
| Format | |
|---|---|
| BibTeX | |
| MARCXML | |
| TextMARC | |
| MARC | |
| DublinCore | |
| EndNote | |
| NLM | |
| RefWorks | |
| RIS | |
Symbol
[E/ECE/]ENERGY/WP.2/R.23
Title
Overview of studies and field tests concerned with East-West interconnections (1993 and beginning of 1994).
Date
Geneva : UN, 15 Feb. 1995.
Description
4 p.
Notes
"Follow-up to the report ENERGY/WP.2/R.12".
Prepared by J. Thiry, Chairman of the Working Party on Electric Power.
Prepared by J. Thiry, Chairman of the Working Party on Electric Power.