Overview of studies and field tests concerned with East-West interconnections (1993 and beginning of 1994).
1995
Formats
Format | |
---|---|
BibTeX | |
MARCXML | |
TextMARC | |
MARC | |
DublinCore | |
EndNote | |
NLM | |
RefWorks | |
RIS |
Details
Symbol[E/ECE/]ENERGY/WP.2/R.23
TitleOverview of studies and field tests concerned with East-West interconnections (1993 and beginning of 1994).
DateGeneva : UN, 15 Feb. 1995.
Description
4 p.
Notes
"Follow-up to the report ENERGY/WP.2/R.12".
Prepared by J. Thiry, Chairman of the Working Party on Electric Power.
Prepared by J. Thiry, Chairman of the Working Party on Electric Power.